| 臺大學術典藏 |
2022-03-22T15:04:46Z |
Research on Monitoring the Nature Frequency of Bridges by Using Wireless Sensors- Bao Bridge and Wanshou Bridge for Example
|
HUI-PING TSERNG; Chen, Hung Yi; Lee, Pi Ru; Chen, Ching Wei |
| 臺大學術典藏 |
2022-03-22T08:27:51Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
| 臺大學術典藏 |
2022-03-22T08:27:51Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
| 臺大學術典藏 |
2022-03-22T08:27:51Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2022-03-22T08:27:51Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2022-03-22T08:25:08Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
| 臺大學術典藏 |
2022-03-22T08:25:08Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2022-03-01 |
Using a Unique Retaining Method for Building Foundation Excavation: A Case Study on Sustainable Construction Methods and Circular Economy
|
Tzou, Hong Kee; HUI-PING TSERNG; Ho, Shiau Jing; Liu, Tai Yi |
| 臺大學術典藏 |
2021-08-05T02:36:41Z |
Automating the generation of indoor space topology for 3D route planning using BIM and 3D-GIS techniques
|
Lin W.Y;Lin P.H;Tserng H.P.; Lin W.Y; Lin P.H; Tserng H.P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2021-07-21T23:20:47Z |
Developing a risk management process for infrastructure projects using idef0
|
HUI-PING TSERNG; Cho, I. Cheng; Chen, Chun Hung; Liu, Yu Fan |
| 臺大學術典藏 |
2021-03-29T06:09:21Z |
房地產開發選擇權評價:二項式選擇權定價模型與蒙特卡羅模擬混合法
|
葉怡成(I-Cheng Yeh);曾惠斌(Hui-Ping Tseng);官苑鈞(Yuan-Chun Kuan);謝博文(Po-Wen Hsieh); 葉怡成(I-Cheng Yeh); 曾惠斌(Hui-Ping Tseng); 官苑鈞(Yuan-Chun Kuan); 謝博文(Po-Wen Hsieh); HUI-PING TSERNG |
| 臺大學術典藏 |
2021-03-29T06:09:20Z |
Management and Research on Public Construction Contract Termination and Cancellation - A Case Study of School Building Renovation Project
|
卓逸程(I-Cheng Cho);曾惠斌(H. P Tserng);徐景文(Ching-Wen Hsu); 卓逸程(I-Cheng Cho); 曾惠斌(H. P Tserng); 徐景文(Ching-Wen Hsu); HUI-PING TSERNG |
| 臺大學術典藏 |
2021-03-29T06:09:20Z |
臺灣私有建築物耐震評估補強經費之財務供需規劃暨其配套措施研議
|
周瑞生(Jui-Sheng Chou);歐昱辰(Yu-Chen Ou);曾惠斌(Hui-Ping Tserng);陳瑞鈴(Jui-Ling Chen);蔡綽芳(Chou-Fang Tsai);張人傑(Jen-Chieh Chang); 周瑞生(Jui-Sheng Chou); 歐昱辰(Yu-Chen Ou); 曾惠斌(Hui-Ping Tserng); 陳瑞鈴(Jui-Ling Chen); 蔡綽芳(Chou-Fang Tsai); 張人傑(Jen-Chieh Chang); HUI-PING TSERNG |
| 臺大學術典藏 |
2021-02-04T02:48:30Z |
Earthquake damage assessment and cost-benefit analysis of seismic retrofitting for private buildings in metropolitan area: case studies on Xingfu and Weiguanjinlong buildings in Tainan city | 都會區私有建築物震損評估與耐震補強成本效益分析-以臺南市幸福及維冠金龍大樓為例
|
Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Yu-Chen Ou; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:46Z |
Health Assessment and Maintenance Strategy for Bridge Management Systems: Lessons Learned in Taiwan
|
Tserng, H. Ping; Chung, Chin-Lung; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:46Z |
Interactive path planning for multi-equipment landfill operations (vol 10, pg 155, 2000)
|
Tserng, H. P.; Ran, B.; Russell, J. S.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:46Z |
Determining minimum contract time for highway projects
|
Shr, J. F.; Thompson, B. P.; Russell, J. S.; Ran, B.; Tserng, H. P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:45Z |
OPSALC: A computer-integrated operations planning system for autonomous landfill compaction
|
Tserng, H.-P.; Veeramani, D.; Kunigahalli, R.; Russell, J.S.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:45Z |
Motion Planning for an Autonomous Compactor in a Waste Landfill Site
|
Kunigahalli, R.; Russell, J.S.; Tserng, H.?P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:45Z |
Closure to "Developing a Resource Supply Chain Planning System or Construction Projects" by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li
|
Tserng, H. Ping; Yin, Samuel Y. L.; Sherman, H. a. U.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:43Z |
AutoPave: Towards an automated paving system for asphalt pavement compaction operations
|
Krishnamurthy, B.K.; Tserng, H.-P.; Schmitt, R.L.; Russell, J.S.; Bahia, H.U.; Hanna, A.S.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:42Z |
An accelerated subcontracting and procuring model for construction projects
|
Tserng, H.P.; Lin, P.H.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:42Z |
Interactive path planning for multi-equipment landfill operations
|
Tserng, H.P.; Ran, B.; Russell, J.S.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:42Z |
Determining minimum contract time for highway projects
|
Shr, J.-F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.; HUI-PING TSERNG |
| 臺大學術典藏 |
2019-12-19T07:12:42Z |
Computer-integrated collaborative design and operation in the construction industry
|
Veeramani, D.; Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG |