|
English
|
正體中文
|
简体中文
|
Total items :2856565
|
|
Visitors :
53369309
Online Users :
854
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Title
|
Showing items 352246-352255 of 2348971 (234898 Page(s) Totally) << < 35220 35221 35222 35223 35224 35225 35226 35227 35228 35229 > >> View [10|25|50] records per page
| 國立成功大學 |
2016-04-03 |
Economic lot sizing in a production system with random demand
|
Lee, Shine-Der; Yang, Chin-Ming; Lan, Shu-Chuan |
| 朝陽科技大學 |
2021-03 |
ECONOMIC MANUFACTURING QUANTITY MODEL WITH MACHINE FAILURE, OVERTIME, AND REWORK/DISPOSAL OF NONCONFORMING ITEMS
|
邱元錫; 王聖嘉; Chiu, Tiffany; Lin, Hong-Dar |
| 南台科技大學 |
2007-11 |
Economic Manufacturing Quantity, Optimum Process Mean, and Economic Specification Limits Setting under the Rectifying Inspection Plan
|
Chung-Ho Chen; Min-Tsai Lai; 賴明才 |
| 南台科技大學 |
2007-11 |
Economic manufacturing quantity, optimum process mean, and economic specification limits setting under the rectifying inspection plan
|
陳忠和; Chung-Ho Chen; Min-Tsai Lai |
| 嘉南藥理大學 |
2009 |
Economic Modelling
|
Elsevier SDOL |
| 國立政治大學 |
2002 |
Economic Models of Innovations:Why GP Can Be a Possible Way Out?
|
陳樹衡 |
| 義守大學 |
2011-10 |
Economic optimization for an off-line inspection, disposition and rework model
|
W. C. Tsai;Chih-Hsiung Wang |
| 國立臺灣科技大學 |
2009 |
Economic optimization of off-line inspection with rework consideration
|
Wang W.-Y.; Sheu S.-H.; Chen Y.-C.; Horng D.-J. |
| 元智大學 |
2010-05 |
Economic optimization of resource-constrained project scheduling: A two-phase metaheuristic approach
|
徐旭昇; Angela H.L. Chen |
| 南亞技術學院 |
2010-06 |
Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach
|
Chen, Angela H. L.;Chyu, Chiuh-Cheng |
Showing items 352246-352255 of 2348971 (234898 Page(s) Totally) << < 35220 35221 35222 35223 35224 35225 35226 35227 35228 35229 > >> View [10|25|50] records per page
|